Loading...
Loading...
Our post hole diggers speed up foundation work for buildings, signboards, street lights, and other construction projects. Dig precise holes in minutes instead of hours.
Construction foundation work requires digging multiple precise holes for pillars, poles, and structural supports. Manual digging with pickaxes and shovels is extremely time-consuming, especially in hard or rocky soil. Inconsistent hole dimensions can compromise structural integrity and cause delays.
MMS Post Hole Diggers create precise, uniform foundation holes rapidly. With auger sizes from 9" to 24", handle everything from signboard foundations to building pillar bases. Complete in minutes what takes hours manually, with consistent quality every time.
Complete foundation holes in minutes instead of hours of manual digging.
Uniform holes ensure proper structural alignment and load distribution.
One operator replaces 8-10 manual laborers for excavation work.
Tungsten carbide teeth handle hard clay, compacted soil, and moderately rocky conditions.
Work easily with our equipment
Survey the construction site and mark foundation hole positions according to architectural plans.
Select appropriate auger size based on foundation requirements. 12" for standard poles, 18"-24" for building pillars.
Position the digger at marked spots and excavate to required depth. Ensure vertical alignment for structural integrity.
Verify hole dimensions meet specifications. Clean loose soil and debris from holes.
Install reinforcement if required, pour concrete, and place structural elements as per design.
Savings with MMS equipment compared to manual methods
| Factor | With MMS Equipment | Manual Method |
|---|---|---|
| Holes per hour | 15-30 | 1-2 |
| Workers needed | 1 operator | 4-6 |
| Cost per hole | ₹30-50 | ₹300-500 |
| Project timeline | 70% faster | Baseline |
Best equipment for this application
Contact our team and learn how our equipment can help you.