Speed up rural electrification projects with MMS post hole diggers and pole erection machines. Dig pole foundation holes quickly for power distribution networks under Saubhagya and DDUGJY schemes.
Electrification projects have strict timelines under government schemes. Manual digging for pole foundations is slow and difficult, especially in hard or rocky terrain. Delays affect project costs and access to electricity for rural communities.
MMS Post Hole Diggers and Pole Erection Machines work together to speed up installation. Dig deep foundation holes quickly even in hard soil, and erect poles safely and efficiently. Complete 15-25 poles per day compared to 3-5 with manual methods.
Complete electrification projects ahead of schedule.
Our equipment handles hard, rocky, and challenging soils with carbide augers.
Mechanized pole erection reduces worker injury risk significantly.
Reduced labor and faster completion improve project economics.
Work easily with our equipment
Mark pole positions along the distribution line route following electrical regulations.
Use post hole digger to create foundation holes (typically 18-24" diameter, 5-6 feet deep).
Use pole erection machine to lift and position poles in the foundation holes.
Pour concrete around pole base and allow to cure before stringing lines.
Install conductors and complete electrical connections as per design.
Savings with MMS equipment compared to manual methods
| Factor | With MMS Equipment | Manual Method |
|---|---|---|
| Poles per day | 15-25 | 3-5 |
| Crew size | 3-4 workers | 10-15 workers |
| Project timeline | 60-70% faster | Baseline |
| Cost per pole | ₹200-400 | ₹800-1200 |
Best equipment for this application
Versatile tractor-mounted digger for efficient earth drilling
Hydraulic pole lifter for electric poles and tall structures
Dual auger system for 2x productivity in large-scale operations
Heavy-duty auger bits for all soil conditions
Contact our team and learn how our equipment can help you.